Expedited production for time-sensitive identification needs, in 3–5 business days for an additional fee against a standard 7–10 days after proof approval. Call and you will reach someone in person who can tell you what is actually possible.
Rush work exists because production schedules move. A unit is ready to ship and the serial plate is wrong. A revision lands late. An order was missed. A customer moved a delivery date and the line has to follow.
None of that is unusual, and none of it needs a conversation about whose fault it was. Tell us the date you actually need parts and we will tell you plainly whether we can hit it.
If the date cannot be hit, we say so rather than accepting the order and explaining later.
U.S. Nameplate Co. performs every step of the manufacturing process in one building — artwork, tooling, printing, fabrication, and inspection. A rush job moves between departments in the same facility rather than between companies.
A supplier who prints in one place and cuts in another cannot compress a schedule very far, because every handoff carries a transit time and a queue. Here the part moves down the hall. That is also why a revision mid-run can be absorbed instead of restarting the whole chain.
Our art department is part of the same building. A blueprint or artwork becomes a press-ready proof without leaving for an outside studio, which removes the step that most often costs a day at the start of a rush.
An expedited order runs through the same ISO 9001:2015 certified process as everything else. It is not a separate, looser path.
Our rejection rate over the past 50 years, across more than 440,000 orders processed, is less than one quarter of one percent of annual sales in each of those years. That number holds because rush work is not exempt from inspection — it is scheduled differently, not checked differently.
Orders ship within a 10% over/under quantity standard, the same as standard production.
Most of the time lost on an urgent order is lost before production starts. Four things move a date more than anything we can do on the floor.
If you are expediting the same parts repeatedly, the fix is usually a stocking program rather than a faster press.
Under stock and release programs we manufacture a production quantity, hold it here, and ship against your releases — invoiced upon delivery rather than upon ordering. Parts arrive from finished stock, so there is no lead time to compress and no rush fee to pay. For equipment that needs many parts per unit, kitting and label sets reduce the number of things that can run short in the first place.
Quotes are free, including on expedited work, and we will confirm the rush fee before anything is produced.
Being straight about this saves everyone a day. Some things shorten well and some do not.
If a new tool is the obstacle, there is often a way around it. A part can frequently be routed digitally for the first run while a die is made for production quantities — you get parts on the original date and the tooling catches up behind them.
Rush work runs across every process here — digital printing in particular avoids tooling lead time, and die and digital cutting can route a part digitally rather than waiting on a new die. For ongoing demand, see stock and release programs and custom manufacturing solutions.
We offer free quotes on all rush services orders. Send the drawing, artwork, quantities, application, and timing you have today — our art department turns a blueprint into a press-ready proof, and we will tell you what is still open.
Most jobs finish 7–10 days after the proof is approved. Rush orders can be produced in 3–5 business days for an additional fee. Orders ship within a 10% over/under quantity standard.
Request a Quote or call 319-895-8804 and you will reach someone in person.